2007: Interim Guidelines

Share this post

Hoover Dam

The 2007 Interim Guidelines were signed in December 2007 and established a shortage framework for the Lower Basin. It also incentivized storage of water in Lake Mead through Intentionally Created Surplus (ICS) and coordinated operations of Lake Powell and Lake Mead.